Contractor intakes scope sheet + site conditions + material costs + labor rates, Claude generates the full bid with line-item takeoff, labor allocation by trade, material pricing with markup, contingency, timeline, and payment schedule. Cross-references against last 10 similar jobs via RAG to sanity-check the number. Cuts a 6-hour estimating job to 45 minutes.
Discovered on Internal via @thetalkinghedge